Rinovim Banje Tirana logoRinovim Banje TiranaBathroom renovation in Tirana — clear prices, guaranteed work
Home › Bathroom Plumbing in Tirana

Bathroom Plumbing in Tirana — Full System Replacement

Bathroom Plumbing in Tirana — Full System Replacement

The plumbing in Tirana's 1970s–90s apartment blocks still runs on iron or galvanised pipes: they corrode from the inside, reduce pressure and often cause hidden leaks that damage the flat below. Replacing the entire bathroom plumbing is the investment that prevents far more expensive damage.

We replace the whole internal branch of the bathroom with multilayer (PEX-AL-PEX) or polypropylene pipes, with modern manifolds that let you shut off each point individually. Together with the system we repair or replace the water heater, the waste stack connection and the pipe insulation.

Indicative prices — the final quote is set after a free on-site survey. See the full price table →

When the plumbing should be replaced

  • Repeated leaks or damp stains on the neighbour's ceiling below
  • Low water pressure, especially on upper floors
  • Brownish water in the morning — a sign of corroding iron pipes
  • A bathroom over 30 years old that has never been touched
  • Before any full renovation — new pipes under new tiles is just logical

How much a new plumbing system costs

Full replacement of a typical bathroom's system — hot and cold water supply, drainage, water heater — costs €400–900 with labour and materials. If the building's vertical stack also needs replacing (with the agreement of neighbours or the building administration), the cost is shared and discussed separately. Every plumbing job we carry out is pressure-tested before the walls are closed and covered by a written warranty.

Why multilayer instead of iron

Multilayer pipes do not corrode, withstand water-heater temperatures, bend without hidden fittings inside the wall and have a service life of over 50 years. Installation is faster and cleaner than welding iron, and every joint stays accessible at the manifold — not sealed inside concrete.

Frequently asked questions

How long does replacing the bathroom plumbing take?

For a standard bathroom, 1–2 days of work for the system, plus pressure testing. The water is shut off only for a few hours in total, not for whole days.

Do I need permission from the building administration?

Not for the system inside your flat. If the main vertical stack is affected, we notify and coordinate with the administration or the neighbours.

Do you also replace the water heater?

Yes, we supply and install 50–80 litre electric water heaters, with RCD protection and a safety valve, included in the same quote.

Ready to start?

Free survey and detailed quote within 48 hours.